UH-60 Phased Maintenance inspection(PMI) rental tool kit

CA$300.00
Sold Out

We have assembled a kit of essential tools for UH60 Phased Maintenance Inspections(PMI) available for rental. Please see the below list for tools included in the kit.

A daily rental rate of 300CAD/day applies to this kit.

Please contact us at mtroyer@crestaerospace.ca for availability and booking.

Please note that this is not a comprehensive kit and you may also require the following: Fuel integrity tester(FIT) unit, Main rotor spindle pressing tools(PMI 2), Main rotor spindle puller(PMI 2), Flight control rigging kit and BIM tester.

  • Pitch beam puller-PN: UH60PBP Used to remove tail rotor pitch beam.

  • Pitch beam socket-PN: UH60PBNS Used to remove tail rotor pitch beam nut.

  • Oil cooler aft viscous bearing tool kit-PN: UH60OCTK Used to remove and install tail driveline viscous damper bearing.

  • Main transmission filter valve closing tool-PN: UH60MGBFT Used to turn filter bowl valve. Note: Not required for IDGB gearbox filter bowl.

  • Input module torque reactor-PN: AB3509A Used for input module flange nut torque check/removal/install.

  • Bifilar bolt holding tool-PN: UH60BHT Holds main rotor bifilar bolt heads while disassembling/assembling.

  • Tail rotor head bolt organizer-PN: UH60TRBO Organizes and retains tail rotor bolts/balance weights in their correct locations.

  • Spring capsule clamps-PN: UH60SCC Holds spring capsules in their extended position for removal/installation.

  • Scissor bushing puller set-PN: UH60SBP Removes/installs swashplate scissor pivot bushings.

  • Main rotor blade pin bushing pressing tool-PN: UH60MRBB Removes/adjusts blade pin bushings in main rotor grips.

  • Main transmission chip detector turning tool-PN: UH60TCDT Assists in turning chip detectors to valve off position for removal.

  • Main rotor damper servicing tool- PN: UH60DHTA Designed to hold the main rotor damper indicator in the extended position for servicing.

  • Input module torque reactor-PN: AB3509A UH60/S70 Blackhawk torque reactor for main gearbox input module flange.

  • Input module torque reactor-PN: AB1704B UH60/S70 Blackhawk torque reactor for main gearbox input module flange.

  • UH-60 Main Module Oil Drain Tool –UH60MGD Oil drain tool for the Sikorsky UH-60/S-70 main module. Alternate P/N D730L (D-730-L), NSN 1560-00-018-6430.

This kit is also available to purchase however the lead time may be 4-6 weeks.

Click here to check out the PMI kit brochure

We have assembled a kit of essential tools for UH60 Phased Maintenance Inspections(PMI) available for rental. Please see the below list for tools included in the kit.

A daily rental rate of 300CAD/day applies to this kit.

Please contact us at mtroyer@crestaerospace.ca for availability and booking.

Please note that this is not a comprehensive kit and you may also require the following: Fuel integrity tester(FIT) unit, Main rotor spindle pressing tools(PMI 2), Main rotor spindle puller(PMI 2), Flight control rigging kit and BIM tester.

  • Pitch beam puller-PN: UH60PBP Used to remove tail rotor pitch beam.

  • Pitch beam socket-PN: UH60PBNS Used to remove tail rotor pitch beam nut.

  • Oil cooler aft viscous bearing tool kit-PN: UH60OCTK Used to remove and install tail driveline viscous damper bearing.

  • Main transmission filter valve closing tool-PN: UH60MGBFT Used to turn filter bowl valve. Note: Not required for IDGB gearbox filter bowl.

  • Input module torque reactor-PN: AB3509A Used for input module flange nut torque check/removal/install.

  • Bifilar bolt holding tool-PN: UH60BHT Holds main rotor bifilar bolt heads while disassembling/assembling.

  • Tail rotor head bolt organizer-PN: UH60TRBO Organizes and retains tail rotor bolts/balance weights in their correct locations.

  • Spring capsule clamps-PN: UH60SCC Holds spring capsules in their extended position for removal/installation.

  • Scissor bushing puller set-PN: UH60SBP Removes/installs swashplate scissor pivot bushings.

  • Main rotor blade pin bushing pressing tool-PN: UH60MRBB Removes/adjusts blade pin bushings in main rotor grips.

  • Main transmission chip detector turning tool-PN: UH60TCDT Assists in turning chip detectors to valve off position for removal.

  • Main rotor damper servicing tool- PN: UH60DHTA Designed to hold the main rotor damper indicator in the extended position for servicing.

  • Input module torque reactor-PN: AB3509A UH60/S70 Blackhawk torque reactor for main gearbox input module flange.

  • Input module torque reactor-PN: AB1704B UH60/S70 Blackhawk torque reactor for main gearbox input module flange.

  • UH-60 Main Module Oil Drain Tool –UH60MGD Oil drain tool for the Sikorsky UH-60/S-70 main module. Alternate P/N D730L (D-730-L), NSN 1560-00-018-6430.

This kit is also available to purchase however the lead time may be 4-6 weeks.

Click here to check out the PMI kit brochure

Get notified by email when this product is in stock.

Safety instructions

Improper use of tools and non-observance of these safety notes can lead to personal injury and property damage.

Completely read, understand and observe the safety notes before use.

This tool is intended only for qualified, skilled personnel.

Always use personal protective equipment (for example safety glasses, safety shoes, protective gloves and suitable working clothes) necessary to protect you from exposure to potential hazards.

Employers are responsible for the safe condition of tools and equipment used. They must notify supervisors and replace damaged tools. Do not use socket wrenches when jaws are sprung to the point that slippage occurs. Keep the floor as clean and dry as possible to prevent slips or trips.

Terms of Sale

Every order is subject to our Terms of Sale, in the last section of our About page, which limit our liability, including for our negligence, and contain an indemnity. Please read them before you order.